Case StudiesWorld trade group events

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office pretty quickly and then had unpacked it even quicker in the new office. Really happy with the experience and so were my managers. We will definitely be using evolve again for our next move and will recommend you to anyone I know who is moving in the future.

Georgina Muckle, FDU

Project Requirements

Breakthrough Breast Cancer and Breast Cancer Now Campaign charities merged to form a new single charity, Breast Cancer Now. The aim was to relocate both from two different sites in WC1 and EC2 to The Minories, EC3. There were approximately 130 staff moving from Weston House in WC1 and 70 staff from The Clifton Centre in EC2.
The Weston House move was to be carried out in 2 phases over 2 weekends with around 40 workstations with all the staff in phase 1 followed by around 90 workstations in phase 1.
The Clifton House move was carried out over a single weekend.
Following the move there was to be clearance of all redundant furniture and equipment.



Services Provided

  • The provision of a dedicated project manager throughout
  • Departmental filing and furniture audits
  • The provision of pre and post move packing and unpacking
  • The relocation of outsize/heavy items including safes as required
  • The dismantling, relocation and re-assembly of Storewall storage cupboards
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of IT equipment
  • Clearance of redundant office furniture
  • The provision of an environmental audit trail and environmental report for the clearance

The actual move of the 2 offices happened over a period of a week. Nothing at all went wrong – it was great. Phil’s removals team were quick, hard working and very helpful.
I would have no hesitation in recommending this company for clearance / relocation services.

Dawn Huggins, CEO Project Manger


Project Outcome

This multi site project was completed on time and within budget to the exact client specification. Multiple on site project meetings were held with the client to help with the smooth running of operations. Evolve were very happy with the outcome and delighted to have helped both charities move together with minimal down time and stress.

Project Requirements

IVECO were to relocate 120 staff to a new site in Basildon from Watford in 2015.
The project required a dedicated Project Manager, multiple site supervisors and a full team of Fitters, IT Engineers and Porters along with building protection to safe guard the current premises integrity.
Environmental Reporting was also to be provided post move to detail Removal and Clearance C02 savings; 0% of cleared items went to landfill.
Evolve were to also help IVECO staff members champion the move which to aid in the efficiency and reduced business down time.



Services Provided

  • The provision of a project manager
  • Departmental filing and furniture audits
  • The provision of pre and post move assistance
  • The relocation of outsize/heavy items including safes
  • The relocation of roller racking as required
  • The decommissioning and re-commissioning of desktop IT
  • The packing and unpacking of specified IT and telecommunications desktop equipment
  • The packing and unpacking of all bulk filing and storage areas
  • The dismantling and clearance of remaining existing furniture
  • The provision of an environmental audit trail and environmental report

I found Evolve to be very reliable and they carried out the move in a very professional manner under challenging circumstance. Our relocation was executed during normal working hours while much of the building was still occupied and operational.

Mike, IVECO


Project Outcome

Evolve mapped a complete multi move timetable from high level plans to departmental timescales which included sequential file packing / unpacking, file audits / file mapping, server relocation, IT decommissioning / re-commissioning and the packing and moving of employees personal effects.
Evolve carried out the entire project management from start to finish providing a wide service portfolio comprehensively supporting the client’s relocation and achieving a ‘zero downtime’ solution.
Office furniture was also sourced and provided by Evolve which completed the full relocation package. The project was delivered on time and on budget, with some challenges along the way, Evolve went above and beyond the client’s expectations.

Project Requirements

FDU required a removals service for 15 staff from Great Poultney Street, West London to North Row, West London.
The client was looking for a removals company that had strong experience, IT decommissioning and re-commissioning capabilities and competitive prices.



Project Outcome

The client was extremely satisfied with Evolve’s service. A pre move planning meeting helped to map out exactly how things would happen, who was involved and assurances given. Even the height of the monitors on each desk were measured and noted so everything could be reconfigured in the exact same accordance with how it was removed. When the move was completed on time and within budget some items were taken to be recycled and recycling certifications were then given to the client. Evolve were glad to have such great feedback and happy that another clients expectations were exceeded.

The move went perfectly, the guys packed up the office prett